Project

L.R. Costanzo Construction (LRC) served as the Construction Manager for fire protection upgrades at a two-building, tenant-occupied warehouse. The project involved the removal of the existing fire protection system, pumphouse, and underground water storage tank. LRC then installed a new, interior ESFR (Early Suppression Fast Response) overhead sprinkler system, a state-of-the-art pumphouse, and an above-ground water storage tank.

Challenges

  • Removing and installing sprinkler system in an active, operating facility that included multiple assembly lines
  • Maintaining safety and productivity while keeping existing systems intact as new ones were installed
  • Selecting the strategic location of the fire protection system and tank to facilitate a seamless transition of utility tie-ins

Solutions

  • Utilized multiple types of equipment (scissor lifts, boom lifts, scaffolding) to reach the varied, challenging areas
  • Installed new systems to 99% completion, preplanned the turnover day, and executed in a reduced timeframe
  • Deeply investigated existing utilities and coordinated with MEP sub-contractors and engineers

Construction Details

  • Fully assembled a 125,000 gallon above-ground water tank on-site
  • Self performed concreted foundations and pad for water tank & pumphouse
  • Installed 14,000 feet of pipe